HOT PARTS
Keep your factory humming with these replacement parts!
part_number : PS-PH50D
description_1 :
PH50D HID search light, 35/50W, with AC charger and hard plastic case
lead_time : 1 week
Type: Bearings
PH50D HID search light, 35/50W, with AC charger and hard plastic casepart_number : R30005
description_1 :
Centura EPI SBR with hub
lead_time : 14 days
Type: Bearings
Centura EPI SBR with hubpart_number : P2001
description_1 : HP+ Pivot Arm, LH
lead_time : 14 days
HP+ Pivot Arm, LH
part_number : PS-B8-P58A
description_1 :
Lithium-ion battery, 5700 mAh, replaces PS-B8-P
lead_time : 3 days
Type: Battery
Battery for NP1, NET40, PH40, PH50, PH50Dpart_number : NSK_MIRRA
description_1 : Refurbishment NSK motor/controller
lead_time : 3 weeks
Refurbishment NSK motor/controller
part_number : shim_10
description_1 : Shim, 10 thousandths, for XP robot
lead_time : 14 days
Shim, 10 thousandths, for XP robot
part_number : H22500
description_1 : HP kit (std w/ wrist asm-thin body)
lead_time : 14 days
HP kit (std w/ wrist asm-thin body)
part_number : SCREW_XP_COVER
description_1 : Screw for XP cover
lead_time : 14 days
Screw for XP cover
part_number : R40200
description_1 :
VXP Robot assy w 1 waist assy, 1 atm brg, 2 arms and 1 rebuilt blade assy
lead_time : 14 days
Type: Bearings
VXP Robot assy w 1 waist assy, 1 atm brg, 2 arms and 1 rebuilt blade assypart_number : M52194
description_1 : VHP kit with T1001 wrists
lead_time : 14 days
VHP kit with T1001 wrists
part_number : A1000
description_1 :
HP Wrist Assy full body
lead_time : 14 days
Type: Bearings
HP Wrist Assy full bodypart_number : M41149
description_1 : VHP-HP with HP+ wrists
lead_time : 14 days
VHP-HP with HP+ wrists
part_number : A1200
description_1 : Replacement HP/VHP transfer blade clamp, compatible with OEM blade
preferred_application : PVD
lead_time : 2 weeks
Type: Robot Assembly
Blade clamp, contains 2 high precision 17-4 pivots and 4 wrist bearingspart_number : M81188
description_1 : HP+-HP+ with lower elbows
lead_time : 14 days
HP+-HP+ with lower elbows
part_number : SE-153949
description_1 :
Lithium battery, Toshiba, ERV6V/3.6V with JAE-5 pin header connector
description_2 :
Lithium battery, non-recyclable, 3.6 V
preferred_application : PVD, CVD, RTP
lead_time : 2 weeks
Type: Battery
Lithium battery, for Yaskawa Motomanpart_number : P30202
description_1 :
Replacement cover, aluminum, milled, nickel plated, grooved, 1 per ACP SBR
lead_time : 14 days
Type: Bearings
Replacement cover, aluminum, milled, nickel plated, grooved, 1 per ACP SBRpart_number : 222300
description_1 : ACP dual arm Bearing
lead_time : 14 days
ACP dual arm Bearing
part_number : H22590
description_1 : H22590 HP Wrist Asm, full body pivots, empty
lead_time : 14 days
H22590 HP Wrist Asm, full body pivots, empty
part_number : A3010NS
description_1 :
Wrist Blade Housing with NO SPRING
lead_time : 14 days
Type: Bearings
Wrist Blade Housing with NO SPRING