HOT PARTS
Keep your factory humming with these replacement parts!
part_number : T52194
description_1 : VHP for TSMC
lead_time : 14 days
VHP for TSMC
part_number : F_6906
description_1 : Bearing, deep groove, 52100,30x47x9mm,SiN balls, PTFE
lead_time : 2 weeks
Bearing, deep groove, 52100,30x47x9mm,SiN balls, PTFE
part_number : E8080
description_1 : Bearing, VHP hub, 4-Pt, ceramic hybrid, double shielded, 440C, PFPE oil lubricant, Brand FALA, condition NEW
lead_time : 14 days
Bearing, VHP hub, 4-Pt, ceramic hybrid, double shielded, 440C, PFPE oil lubricant, Brand FALA, condition NEW
part_number : P1002
description_1 :
Thin HP right hand pivot arm
lead_time : 14 days
Type: Bearings
Thin HP right hand pivot armpart_number : SPT-1810-121923-11
preferred_application : etch
lead_time : 6 weeks
CEL (0808-4999-0070) SILICON (CEL 320-T5)
part_number : Filter Red
description_1 :
Red Filter
description_2 :
For low light applications
lead_time : 1 week
Type: Flashlight Accessory
Red Filter for Polarion lightspart_number : R50004
description_1 :
Producer Robot Rebuild
lead_time : 14 days
Type: Bearings
Producer Robot Rebuildpart_number : Pivot Rework
model_number : Frederic
description_1 : Bouchard
description_2 : France
preferred_application : Alice
lead_time : 14 days
Pivot Rework
part_number : K50004
description_1 : Producer SE bearing kit: S-Cote
lead_time : 14 days
Producer SE bearing kit
part_number : H41690R
description_1 : Recon VHP/HP+ EnhCeramic + Housing
lead_time : 14 days
Recon VHP/HP+ EnhCeramic + Housing
part_number : B2000
description_1 : 8in HP+ Buffer HTHU
lead_time : 14 days
8in HP+ Buffer HTHU
part_number : PL-6U
description_1 : High flux handheld 6W LED UV light, for cleanroom inspection, 365 nm, 1750 mW, 6061 Al construction, non-slip silicone grip, IP68 water resistant, aluminum reflector, micro USB charging system with charge indicator, 2600 mAh Li-Ion battery, 700 lumens
lead_time : 1 week
Type: Flashlight
Handheld UV light, LED, 6 W, 365 nmpart_number : SPT-3D10-302020-11
preferred_application : etch
lead_time : 6 weeks
CEL, OX T1-75-C912(COC-N) / 912CEL
part_number : 4-40x3/8 FHS
description_1 : Cover Screw
lead_time : 14 days
Cover Screw
part_number : R16000
description_1 :
Rework (new design) of existing UVC trays
lead_time : 14 days
Type: Bearings
Rework (new design) of existing UVC trayspart_number : F_47X0
description_1 : Bearing, ceramic with brass cage, BRAYCOTE oil lubricant, 4.7'', 4-PT
lead_time : 14 days
Bearing, ceramic with brass cage, BRAYCOTE oil lubricant, 4.7'', 4-PT
part_number : R10177
description_1 : ULVAC Keytran Kit
lead_time : 14 days
ULVAC Keytran Kit
part_number : VXP_ANALYSIS
lead_time : 3 weeks
Type: Bearings
Repair Evaluationpart_number : H41670
description_1 : Bearing kit with 2 Fala blade housings
description_2 : Contains 2X E8020, 4X E0420, 2 VHP/HP+ transfer blade housing with high precision pivots, preassembled
lead_time : 14 days
Maintenance kit for VHP robots