HOT PARTS
Keep your factory humming with these replacement parts!
part_number : S-069688-076-C
preferred_application : etch
lead_time : 6 weeks
polished electrode
part_number : HG-AC11-P-BH-OEM
description_1 : Heater, double-wall vessel, SS, with 6mm input & output, with 1kW heater & 1 thermocouple, Hi-T snap switch, 200mm long, 90mm OD by 200mm, thermal insulation sleeve, (up to 80 slm 250C @85 psi
lead_time : 3 weeks
Heater, double-wall vessel, SS, with 6mm input & output, with 1kW heater & 1 thermocouple, Hi-T snap switch, 200mm long, 90mm OD by 200mm, thermal insulation sleeve, (up to 80 slm 250C @85 psi
part_number : E0375
description_1 : .375 ID Elbow, Ceramic Hybrid, 300mm
lead_time : 14 days
.375 ID Elbow, Ceramic Hybrid, 300mm
part_number : B1000R
description_1 :
Robot Blade Rework
lead_time : 14 days
Type: Bearings
Robot Blade Reworkpart_number : SPTH1305601
description_1 :
VXP Robot Transit Case
lead_time : 3 weeks
Type: Bearings
VXP Robot Transit Casepart_number : 0010-19899
description_1 : XP Waist Assembly, Fixed wing upper, Applied Materials
lead_time : 2 weeks
XP Waist Assembly, Fixed wing upper, Applied Materials
part_number : M52194
description_1 : VHP kit with T1001 wrists
lead_time : 14 days
VHP kit with T1001 wrists
part_number : E0865
description_1 : Bearing, 52100, super-duplex, ceramic hybrid, ultrafinished, shielded, PTFE-PFPE lubricated, NEW brand FALA, for ACP SBR upper elbow
preferred_application : RTP
lead_time : 14 days
Bearing, 52100, super-duplex, ceramic hybrid, ultrafinished, shielded, PTFE-PFPE lubricated, NEW brand FALA, for ACP SBR upper elbow
part_number : PS-NET40
description_1 :
Polarion Hand-held UV light, high flux, 365 nm
description_2 :
Ideal for inspection in semiconductor manufacturing
lead_time : 1 week
Type: Flashlight
40W HID hand-held inspection lightpart_number : XP_REPAIR
description_1 :
Repair of XP robot
lead_time : 3 weeks
Type: Bearings
repair of XP motor stackpart_number : R40200
description_1 :
VXP Robot assy w 1 waist assy, 1 atm brg, 2 arms and 1 rebuilt blade assy
lead_time : 14 days
Type: Bearings
VXP Robot assy w 1 waist assy, 1 atm brg, 2 arms and 1 rebuilt blade assypart_number : shim_30
description_1 : Shim, 30 thousandths, for XP robot
lead_time : 14 days
Shim, 30 thousandths, for XP robot
part_number : 0010-19900
description_1 : XP Waist Assembly, Fixed wing lower, Applied Materials
lead_time : 2 weeks
XP Waist Assembly, Fixed wing lower, Applied Materials
part_number : M0009
description_1 : Hardware kit
lead_time : 14 days
Hardware kit
part_number : R50008
description_1 :
Producer robot, preassembled, MAC + Ti Bushings
lead_time : 14 days
Type: Bearings
Producer robot, preassembled, MAC + Ti Bushingspart_number : 525020
description_1 : Bearing kit, Centura SBR, no hub bearings
lead_time : 14 days
Bearing kit, Centura SBR, no hub bearings
part_number : R40102
description_1 : XP Forearm Rework, w/2 upper, 2 lower (w/4 E0668)
lead_time : 14 days
XP Forearm Rework, w/2 upper, 2 lower (w/4 E0668)
part_number : S-01797
preferred_application : etch
lead_time : 6 weeks
Ring, silicon
part_number : VHP_Analysis
description_1 : Repair of motor, includes full electromechanical testing
description_2 : NSK Motoman
preferred_application : PVD, CVD
lead_time : 21 days
Type: Repair
Reconditioning of customer-owned NSK motor stack