HOT PARTS
Keep your factory humming with these replacement parts!
part_number : R30002
description_1 : Reworked 300mm Centura Right
lead_time : 14 days
Reworked 300mm Centura Right
part_number : S-069688-005
preferred_application : etch
lead_time : 6 weeks
electrode, silicon
part_number : Belt
description_1 : Single Arm Belt
lead_time : 14 days
Single Arm Belt
part_number : H52958
description_1 : HP+ kit, with new pivots
lead_time : 14 days
HP+ kit, with new pivots
part_number : LC5
description_1 : Repair of LC5 motor controller
lead_time : 3 weeks
Repair of LC5 motor controller
part_number : T52194
description_1 : VHP for TSMC
lead_time : 14 days
VHP for TSMC
part_number : A1200NS
description_1 : VHP Wrist Asm, Full-body pivots No Springs
lead_time : 14 days
VHP Wrist Asm, Full-body pivots No Springs
part_number : HG-AC11-P-BH-OEM
description_1 : Heater, double-wall vessel, SS, with 6mm input & output, with 1kW heater & 1 thermocouple, Hi-T snap switch, 200mm long, 90mm OD by 200mm, thermal insulation sleeve, (up to 80 slm 250C @85 psi
lead_time : 3 weeks
Heater, double-wall vessel, SS, with 6mm input & output, with 1kW heater & 1 thermocouple, Hi-T snap switch, 200mm long, 90mm OD by 200mm, thermal insulation sleeve, (up to 80 slm 250C @85 psi
part_number : SPT-ES1D87-053099-21
preferred_application : etch
lead_time : 6 weeks
ELECTRODE CRYSTAL
part_number : R50005
description_1 :
PM kit for producer robot (half kit)
lead_time : 14 days
Type: Bearings
PM kit for producer robot (half kit)part_number : R80003
description_1 : VHP Hub Assembly, pre-assembled, eHUB, PLT
description_2 : R80001
lead_time : 14 days
VHP Hub Assembly, pre-assembled, eHUB, PLT
part_number : R50002
description_1 :
Producer Robot Arm Assy, Right
lead_time : 14 days
Type: Bearings
Producer Robot Arm Assy, Rightpart_number : A3010F
description_1 :
Housing 300mm with flags
lead_time : 14 days
Type: Bearings
Housing 300mm with flagspart_number : B2000
description_1 : 8in HP+ Buffer HTHU
lead_time : 14 days
8in HP+ Buffer HTHU
part_number : T101705
description_1 : Telius DRM
lead_time : 14 days
Telius DRM
part_number : S-082039-232
preferred_application : etch
lead_time : 6 weeks
electrode, silicon
part_number : 610T0348-1
description_1 : Semitool Robot Repair
preferred_application : Plating
lead_time : 3 weeks
Semitool Robot Repair
part_number : A2300
description_1 :
Replacement HDP clamp, compatible with quartz blade, for epi
preferred_application : HDP, EPI
lead_time : 2 weeks
Type: Robot Assembly
Blade clamp, contains 2 high precision 17-4 pivots and 4 wrist bearingspart_number : SCC1-USB cable
description_1 : USB CABLE
lead_time : 3 weeks
USB CABLE