HOT PARTS
Keep your factory humming with these replacement parts!
part_number : R30005
description_1 :
Centura EPI SBR with hub
lead_time : 14 days
Type: Bearings
Centura EPI SBR with hubpart_number : HG-AC11-P-BH-OEM
description_1 : Heater, double-wall vessel, SS, with 6mm input & output, with 1kW heater & 1 thermocouple, Hi-T snap switch, 200mm long, 90mm OD by 200mm, thermal insulation sleeve, (up to 80 slm 250C @85 psi
lead_time : 3 weeks
Heater, double-wall vessel, SS, with 6mm input & output, with 1kW heater & 1 thermocouple, Hi-T snap switch, 200mm long, 90mm OD by 200mm, thermal insulation sleeve, (up to 80 slm 250C @85 psi
part_number : M52194
description_1 : VHP kit with T1001 wrists
lead_time : 14 days
VHP kit with T1001 wrists
part_number : E8080
description_1 : Bearing, VHP hub, 4-Pt, ceramic hybrid, double shielded, 440C, PFPE oil lubricant, Brand FALA, condition NEW
lead_time : 14 days
Bearing, VHP hub, 4-Pt, ceramic hybrid, double shielded, 440C, PFPE oil lubricant, Brand FALA, condition NEW
part_number : A50010
description_1 : VHP Arm Left
lead_time : 14 days
VHP Arm Left
part_number : P2002
description_1 : HP+ Pivot Arm, RH
lead_time : 14 days
HP+ Pivot Arm, RH
part_number : HG-AC11-TIC
description_1 : Replacement thermocouple with fitting for 2 kW heater
lead_time : 3 weeks
Replacement thermocouple with fitting for 2 kW heater
part_number : SCREW_XP_COVER
description_1 : Screw for XP cover
lead_time : 14 days
Screw for XP cover
part_number : S-082039-232
preferred_application : etch
lead_time : 6 weeks
electrode, silicon
part_number : 211300
description_1 : 300 mm robot PM kit, RTX
lead_time : 14 days
300 mm robot PM kit, RTX
part_number : SPT-012639-024
description_1 : Injector, sapphire, 8X, .055-45DEG
preferred_application : etch
lead_time : 6 weeks
Nozzle injector for ALD and RIE
part_number : A3010
description_1 :
300mm wrist assembly, shielded gears
lead_time : 14 days
Type: Bearings
300mm wrist assembly, shielded gearspart_number : 0010-19900
description_1 : XP Waist Assembly, Fixed wing lower, Applied Materials
lead_time : 2 weeks
XP Waist Assembly, Fixed wing lower, Applied Materials
part_number : C2301
description_1 :
Base, wrist (A2300) mounting EHP-CR
lead_time : 14 days
Type: Bearings
Base, wrist (A2300) mounting EHP-CRpart_number : A1000C
description_1 :
HDP Buffer with guide pins
lead_time : 14 days
Type: Bearings
HDP Buffer with guide pinspart_number : H3011
description_1 : EMAX 300mm wrist base
lead_time : 14 days
EMAX 300mm wrist base
part_number : SPTH1713202
description_1 :
1/2'' VHP Motor Transit Case
description_2 :
Available in different colors
lead_time : 3 weeks
Type: Bearings
1/2'' VHP Motor Transit Casepart_number : HG-L-1K-220V
description_1 : Spare lamp for Velios gas injection system, 1kW, UL Version
lead_time : 3 weeks
Spare lamp for Velios gas injection system, 1kW, UL Version
part_number : H91410
description_1 : HP/HP kit (with pivot assy-full body)
lead_time : 14 days
HP/HP kit (with pivot assy-full body)