HOT PARTS
Keep your factory humming with these replacement parts!
part_number : XP Hardware
description_1 : XP Hardware (2 complete sets)
lead_time : 14 days
XP Hardware (2 complete sets)
part_number : 211300S
description_1 : 300mm VHP Robot Bearing Kit, with 2 new Fala Wrist Assy NO SPRING
lead_time : 14 days
300mm VHP Robot Bearing Kit, with 2 new Fala Wrist Assy NO SPRING
part_number : SVO DRV-EP0810AF3-05
description_1 : NSK SERVO DRIVER REPAIR
lead_time : 3 weeks
Motor Repair
part_number : Driver_0190-14372
description_1 : Repair Yaskawa Driver - Model 0190-14372
lead_time : 3 weeks
Repair Yaskawa Driver - Model 0190-14372
part_number : H41690R
description_1 : Recon VHP/HP+ EnhCeramic + Housing
lead_time : 14 days
Recon VHP/HP+ EnhCeramic + Housing
part_number : HG-AC11-BM-L-S
description_1 : Vélios, UL Certified, with 2kW heater
lead_time : 3 weeks
Vélios, UL Certified, with 2kW heater
part_number : NSK_C_RF
description_1 : Refurbishment NSK Controller
lead_time : 3 weeks
Refurbishment NSK Controller
part_number : F_6906
description_1 : Bearing, deep groove, 52100,30x47x9mm,SiN balls, PTFE
lead_time : 2 weeks
Bearing, deep groove, 52100,30x47x9mm,SiN balls, PTFE
part_number : Filter IR
description_1 :
Filter IR (850 nm) for Polarion Lights
description_2 :
For night vision equipment
lead_time : 1 week
Type: Flashlight Accessory
Filter IR (850 nm) for Polarion Lightspart_number : XP_BLOCK
description_1 : Clamp, XP blade assembly
description_2 : C3015
lead_time : 14 days
Clamp, XP blade assembly
part_number : HG-AC11-P-BH-OEM
description_1 : Heater, double-wall vessel, SS, with 6mm input & output, with 1kW heater & 1 thermocouple, Hi-T snap switch, 200mm long, 90mm OD by 200mm, thermal insulation sleeve, (up to 80 slm 250C @85 psi
lead_time : 3 weeks
Heater, double-wall vessel, SS, with 6mm input & output, with 1kW heater & 1 thermocouple, Hi-T snap switch, 200mm long, 90mm OD by 200mm, thermal insulation sleeve, (up to 80 slm 250C @85 psi
part_number : E2001S
description_1 :
Bearing, shielded, 2.5X2X.250IN, angular
description_2 :
with S-6530 or equivalent grease
preferred_application : Diffusion
lead_time : 2 weeks
Type: Bearings
Bearing, ceramic hybrid with Hi-T grease , shieldedpart_number : QT500S KIT
description_1 : PRS Sensirion QT500 single dispense, GMPC integrated
lead_time : 3 weeks
PRS Sensirion QT500 single dispense, GMPC integrated
part_number : SPTH1534501:FABPP0004301
description_1 : Motor Box HDPE/Cross Linked PE Foam
lead_time : 2 weeks
Motor Box HDPE/Cross Linked PE Foam
part_number : 0040-61519
description_1 : Blade clamp, Producer, OEM
lead_time : 14 days
Blade clamp, Producer, OEM
part_number : R50002
description_1 :
Producer Robot Arm Assy, Right
lead_time : 14 days
Type: Bearings
Producer Robot Arm Assy, Rightpart_number : P16005
description_1 :
Idler/Tensioning Pulley with bearing
description_2 :
UV cure pulley
lead_time : 14 days
Type: Bearings
Idler/Tensioning Pulley with bearingpart_number : shim_20
description_1 : Shim, 20 thousandths, for XP robot
lead_time : 14 days
Shim, 20 thousandths, for XP robot
part_number : SPT-3D10-250012-11
preferred_application : etch
lead_time : 6 weeks
Thin Inner Cell(738)
part_number : Filter Red
description_1 :
Red Filter
description_2 :
For low light applications
lead_time : 1 week
Type: Flashlight Accessory
Red Filter for Polarion lights