HOT PARTS
Keep your factory humming with these replacement parts!
part_number : H22590
description_1 : H22590 HP Wrist Asm, full body pivots, empty
lead_time : 14 days
H22590 HP Wrist Asm, full body pivots, empty
part_number : R80003
description_1 : VHP Hub Assembly, pre-assembled, eHUB, PLT
description_2 : R80001
lead_time : 14 days
VHP Hub Assembly, pre-assembled, eHUB, PLT
part_number : T1002
description_1 :
Shielded wrist
lead_time : 14 days
Type: Bearings
Shielded wristpart_number : R40102
description_1 : XP Forearm Rework, w/2 upper, 2 lower (w/4 E0668)
lead_time : 14 days
XP Forearm Rework, w/2 upper, 2 lower (w/4 E0668)
part_number : E0985
description_1 :
Lower elbow bearing, ceramic hybrid, shielded, for Producer SE robot
lead_time : 14 days
Type: Bearings
0.984'' Lower Elbow, Ceramic Hybridpart_number : H52908
description_1 : HP+ kit (std w/wrist asm-top elbow)
description_2 : 4X E6020 - 2X E0420 - 1X A2100 HP+ buffer blade housing
lead_time : 14 days
HP+ kit (std w/wrist asm-top elbow)
part_number : R40010
description_1 : XP elbow UPPER (w/ E0668)
lead_time : 14 days
XP elbow UPPER (w/ E0668)
part_number : XP Hardware
description_1 : XP Hardware (2 complete sets)
lead_time : 14 days
XP Hardware (2 complete sets)
part_number : H41670
description_1 : Bearing kit with 2 Fala blade housings
description_2 : Contains 2X E8020, 4X E0420, 2 VHP/HP+ transfer blade housing with high precision pivots, preassembled
lead_time : 14 days
Maintenance kit for VHP robots
part_number : R50005
description_1 :
PM kit for producer robot (half kit)
lead_time : 14 days
Type: Bearings
PM kit for producer robot (half kit)part_number : B3000
description_1 : Blade, aluminum, Ni-plated, XP
lead_time : 14 days
Blade, aluminum, Ni-plated, XP
part_number : PN_DEMO
model_number : Model_number
description_1 : description_1
description_2 : description_2
preferred_application : preferred_application
lead_time : 3 weeks
Type: Flashlight Accessory
product_descriptionpart_number : LC5
description_1 : Repair of LC5 motor controller
lead_time : 3 weeks
Repair of LC5 motor controller
part_number : S-015480-003
preferred_application : etch
lead_time : 6 weeks
graphite electrode
part_number : H22589
description_1 : HP Centura Kit
lead_time : 14 days
HP Centura kit
part_number : E6020
description_1 :
Hub bearing for HP and HP+ hub assemblies, ceramic hybrid 4-PT, 440C double shielded
lead_time : 14 days
Type: Bearings
4-PT ceramic hybrid bearing, double shieldedpart_number : HID Bulb
description_1 :
Net 40 Replacement bulb
lead_time : 1 week
Type: Bearings
Net 40 Replacement bulbpart_number : Lamp
description_1 :
Spare lamp for Polarion HID light
lead_time : 1 week
Type: Bearings
Spare lamp for lightpart_number : K20000
description_1 :
Refill kit, for A3000/A3010, contains 4 new E3001 ceramic hybrid bearings and replacement hardware
lead_time : 14 days
Type: Bearings
Refill kit, for A3000/A3010, contains 4 new E3001 ceramic hybrid bearings and replacement hardwarepart_number : A2009T
description_1 :
HP Titanium Housing Set
lead_time : 14 days
Type: Bearings
HP Titanium Housing Set