HOT PARTS
Keep your factory humming with these replacement parts!
part_number : B1000
description_1 :
200mm HP Blade, Buffer
lead_time : 14 days
Type: Bearings
200mm HP Blade, Bufferpart_number : Bracket
description_1 : Bracket for light
lead_time : 1 week
Bracket for light
part_number : SPT-2L10-152705-11
preferred_application : etch
lead_time : 6 weeks
ELECTRODE, BTM MP-ATCCC FL2PH
part_number : HG-L-1K-220V
description_1 : Spare lamp for Velios gas injection system, 1kW, UL Version
lead_time : 3 weeks
Spare lamp for Velios gas injection system, 1kW, UL Version
part_number : RBT - 4022.480.1707
description_1 : AWH double fold robot repair
lead_time : 3 weeks
AWH double fold robot repair
part_number : 0010-19900
description_1 : XP Waist Assembly, Fixed wing lower, Applied Materials
lead_time : 2 weeks
XP Waist Assembly, Fixed wing lower, Applied Materials
part_number : M0012
description_1 : Kit Screws and Washers
lead_time : 14 days
Kit Screws and Washers
part_number : A50010
description_1 : VHP Arm Left
lead_time : 14 days
VHP Arm Left
part_number : MTR-BLF2924-10-0-S-026
description_1 : Motor Repair
lead_time : 3 weeks
Motor Repair
part_number : XP Puller
description_1 : XP PULLER
lead_time : 14 days
XP PULLER
part_number : FT-200-BTD
description_1 : 200mm Table Top SMIF Depodder
lead_time : 14 days
200mm Table Top SMIF Depodder
part_number : R30003
description_1 : DBR 300 mm, no housings
lead_time : 14 days
DBR 300 mm, no housings
part_number : E16000
description_1 :
Ball bearing, 16" ID for lamp tray
description_2 :
Bearing for UV cure tray
lead_time : 14 days
Type: Bearings
16" bearing, angular, ceramic, MACpart_number : H81900
description_1 : HP+/HP+ Robot PM Kit
lead_time : 14 days
HP+/HP+ Robot PM Kit
part_number : H22500
description_1 : HP kit (std w/ wrist asm-thin body)
lead_time : 14 days
HP kit (std w/ wrist asm-thin body)
part_number : NSK_D_VHP
description_1 : Repair, NSK Driver, VHP Upper Motor, OEM Ref 0190-29935
description_2 : 0190-29935
lead_time : 3 weeks
Repair, NSK Driver, VHP Upper Motor
part_number : TOOLING
description_1 : Non-recurring set up charge
lead_time : 2 weeks
Non-recurring set up charge
part_number : H1200
description_1 : VHP wrist housing
lead_time : 14 days
VHP wrist housing
part_number : Bulb
description_1 :
HID replacement bulb with wire harness
description_2 :
Genuine Polarion replacement
lead_time : 1 week
Type: Bearings
HID replacement bulb with wire harnesspart_number : K30005-C
description_1 : Centura SBR Legacy Refill kit with belts, contains 2 E8020, 4 T1002, 4 E0985,and 2 belts + misc. hardware
lead_time : 14 days
Centura SBR Legacy Refill kit with belts, contains 2 E8020, 4 T1002, 4 E0985,and 2 belts + misc. hardware