HOT PARTS
Keep your factory humming with these replacement parts!
part_number : H22510
description_1 : HP Kit (std w/ wrist asm-full body), buffer
lead_time : 14 days
HP Kit (std w/ wrist asm-full body), buffer
part_number : 610T0348-1
description_1 : Semitool Robot Repair
preferred_application : Plating
lead_time : 3 weeks
Semitool Robot Repair
part_number : K40200
description_1 :
VxP Robot PM Kit containing 2 duplex, 4 elbow, 1 atmospheric
lead_time : 14 days
Type: Bearings
VxP Robot PM Kit containing 2 duplex, 4 elbow, 1 atmosphericpart_number : R40002
description_2 : Full rebuild of customer owner equipment. UV inspection and droop test
preferred_application : PVD
lead_time : 2 weeks
Type: Robot Assembly
Rework of customer owner XP waist assembly, lower, with new Fala bearingspart_number : H52180
description_1 : VHP Kit w/o Wrist
lead_time : 14 days
VHP Kit w/o Wrist
part_number : E2200
description_1 : TEL MB2 Small Ceramic Hybrid, Shielded
lead_time : 14 days
TEL MB2 Small Ceramic Hybrid, Shielded
part_number : B1000
description_1 :
200mm HP Blade, Buffer
lead_time : 14 days
Type: Bearings
200mm HP Blade, Bufferpart_number : 15C121-010
description_1 : Repair Amplifier, Servo driver, etc.
lead_time : 3 weeks
Repair Amplifier, Servo driver, etc.
part_number : H41655
description_1 : VHP - HP+ Robot Bearing PM Kit and pivots/std only
lead_time : 14 days
VHP - HP+ Robot Bearing PM Kit and pivots/std only
part_number : K20000
description_1 :
Refill kit, for A3000/A3010, contains 4 new E3001 ceramic hybrid bearings and replacement hardware
lead_time : 14 days
Type: Bearings
Refill kit, for A3000/A3010, contains 4 new E3001 ceramic hybrid bearings and replacement hardwarepart_number : Tape
description_1 : Thermal protection Sleeve, rated 850C on inside and 260C on the outside
lead_time : 3 weeks
Thermal protection Sleeve, rated 850C on inside and 260C on the outside
part_number : M92857
description_1 : HP-HP with HP+ wrists
lead_time : 14 days
HP-HP with HP+ wrists
part_number : PSRG2500ULSH00
description_1 :
Replacement piston, 2.5 mL
preferred_application : ECD
lead_time : 6 weeks
Type: Bearings
Piston, syringe, 2.5 mLpart_number : H52985
description_1 : 200mm HP+ Bearing Kit (with E1001)
lead_time : 14 days
Type: Kit
200mm HP+ Bearing Kit (with E1001)part_number : PL-E702
description_1 :
LED searchlight, multimode, 30 W, 600 meter range with rail handle
description_2 :
Includes cradle and tripod hole
lead_time : 2 weeks
Type: Flashlight
Light with rail handle, LED, 30W, multimodepart_number : R50002
description_1 :
Producer Robot Arm Assy, Right
lead_time : 14 days
Type: Bearings
Producer Robot Arm Assy, Rightpart_number : H52908
description_1 : HP+ kit (std w/wrist asm-top elbow)
description_2 : 4X E6020 - 2X E0420 - 1X A2100 HP+ buffer blade housing
lead_time : 14 days
HP+ kit (std w/wrist asm-top elbow)