HOT PARTS
Keep your factory humming with these replacement parts!
part_number : XP_BOX_MOD
description_1 : Rework of existing box to accommodate extra components
lead_time : 14 days
Rework of existing box to accommodate extra components
part_number : NP1_Cap
description_1 :
NP1 End Cap
lead_time : 1 week
Type: Bearings
NP1 End Cappart_number : B1205
description_1 : Blade, aluminum, HP transfer, nickel plated, for 150 mm wafers, compatible with A1000
lead_time : 14 days
Blade, aluminum, HP transfer, nickel plated, for 150 mm wafers, compatible with A1000
part_number : H22589
description_1 : HP Centura Kit
lead_time : 14 days
HP Centura kit
part_number : R50004
description_1 :
Producer Robot Rebuild
lead_time : 14 days
Type: Bearings
Producer Robot Rebuildpart_number : SPT-012639-024
description_1 : Injector, sapphire, 8X, .055-45DEG
preferred_application : etch
lead_time : 6 weeks
Nozzle injector for ALD and RIE
part_number : Filter Green
description_1 :
Green filter
description_2 :
For surface inspection
lead_time : 1 week
Type: Flashlight Accessory
Green Filter for Polarion Lightspart_number : PRO_ROBOT
description_1 :
Producer Robot with arm assembly
lead_time : 2 weeks
Type: Bearings
Producer Robot with arm assemblypart_number : R16000
description_1 :
Rework (new design) of existing UVC trays
lead_time : 14 days
Type: Bearings
Rework (new design) of existing UVC trayspart_number : A3001
description_1 : 300 mm Pivot Asm, LH
lead_time : 14 days
300 mm Pivot Asm, LH
part_number : B1000-M
description_1 :
Blade, aluminum, nickel coated, thin profile, 150/200, 4 pads
lead_time : 14 days
Type: Bearings
Blade, aluminum, nickel coated, thin profile, 150/200, 4 padspart_number : H22540
description_1 : HP kit-buffer-SiO2 Blade
lead_time : 14 days
HP kit-buffer-SiO2 Blade
part_number : VxP_Cover
description_1 : VxP Cover
lead_time : 14 days
VxP Cover
part_number : SPTH1534501:FABPP0004301
description_1 : Motor Box HDPE/Cross Linked PE Foam
lead_time : 2 weeks
Motor Box HDPE/Cross Linked PE Foam
part_number : R80001
lead_time : 14 days
Type: Robot Assembly
Rework of customer owner hub assembly, new Fala bearingspart_number : NTC
description_1 : Needle Tool Calibration
lead_time : 2 weeks
Needle Tool Calibration
part_number : B1000
description_1 :
200mm HP Blade, Buffer
lead_time : 14 days
Type: Bearings
200mm HP Blade, Bufferpart_number : KA060XP0
description_1 : 6 inch-6.5 in-0.25in
lead_time : 2 weeks
6 inch-6.5 in-0.25in
part_number : SPT-3D10-250266-11
preferred_application : etch
lead_time : 6 weeks
MODIFIED CEL INNER (TE-T10-P-LABY)