HOT PARTS
Keep your factory humming with these replacement parts!
part_number : PS-X1
description_1 :
Light weight 35W HID light with hard case and AC charger
description_2 :
by Polarion
lead_time : 1 week
Type: Flashlight
35W HID light with hard case and AC chargerpart_number : A2100NS
description_1 : HP+ Blade housing - No Springs
lead_time : 14 days
HP+ Blade housing - No Springs
part_number : Lubrication
description_1 : 803 BRAYCOTE oil lubrication
lead_time : 14 days
803 BRAYCOTE oil lubrication
part_number : XP Puller
description_1 : XP PULLER
lead_time : 14 days
XP PULLER
part_number : A3010
description_1 :
300mm wrist assembly, shielded gears
lead_time : 14 days
Type: Bearings
300mm wrist assembly, shielded gearspart_number : H22560
description_1 : HP Kit (std w/ wrist asm-full body)
lead_time : 14 days
HP Kit (std w/ wrist asm-full body)
part_number : H32190
description_1 : 300 VHP PM kit
lead_time : 14 days
300 VHP PM kit
part_number : GMPC
description_1 : Server, embedded Windows XP, SECS-GEM license, with data acquisition software for Sensirion RS485 signals
lead_time : 3 weeks
Server, embedded Windows XP, SECS-GEM license, with data acquisition software for Sensirion RS485 signals
part_number : Bat_MOLEX
description_1 : Lithium battery, Toshiba, ERV6V/3.6V with MOLEX 8-pin connector
description_2 : Lithium battery, non-rechargeable, 3.6 V
preferred_application : PVD, CVD, RTP
lead_time : 2 weeks
Type: Battery
Lithium battery, for Yaskawa robotpart_number : E2776
description_1 : Bearing, hybrid, fluorinated grease, 70mm x 86mm, 4-point contact
lead_time : 14 days
Bearing, hybrid, fluorinated grease, 70mm x 86mm, 4-point contact
part_number : R40102
description_1 : XP Forearm Rework, w/2 upper, 2 lower (w/4 E0668)
lead_time : 14 days
XP Forearm Rework, w/2 upper, 2 lower (w/4 E0668)
part_number : PS-NP1
description_1 :
Polarion NP1 35W light with push button switch with battery, charger and hard case
lead_time : 1 week
Type: Bearings
NP1 35W light with push switch with L-ion battery, charger and hard casepart_number : A50021
description_1 : Producer robot arm assy, right full
lead_time : 14 days
Producer robot arm assy, right full
part_number : B1000-M
description_1 :
Blade, aluminum, nickel coated, thin profile, 150/200, 4 pads
lead_time : 14 days
Type: Bearings
Blade, aluminum, nickel coated, thin profile, 150/200, 4 padspart_number : H56020
description_1 : Hub PM Kit (4 hub shielded ceramic hybrid for HP+)
lead_time : 14 days
Hub PM Kit (4 hub shielded ceramic hybrid for HP+)
part_number : Bulb
description_1 :
HID replacement bulb with wire harness
description_2 :
Genuine Polarion replacement
lead_time : 1 week
Type: Bearings
HID replacement bulb with wire harnesspart_number : R50005
description_1 :
PM kit for producer robot (half kit)
lead_time : 14 days
Type: Bearings
PM kit for producer robot (half kit)part_number : 4-40x3/8 FHS
description_1 : Cover Screw
lead_time : 14 days
Cover Screw
part_number : M3001
description_1 : Hardware kit, 4 x 4-40 x 3/4 screw, nylon + Oring, viton, 7.984 ID, 0.139W
lead_time : 14 days
Hardware kit, 4 x 4-40 x 3/4 screw, nylon + Oring, viton, 7.984 ID, 0.139W
part_number : P1001
description_1 :
Thin HP left hand pivot arm
lead_time : 14 days
Type: Bearings
Thin HP left hand pivot arm