HOT PARTS
Keep your factory humming with these replacement parts!
part_number : M0003
description_1 : HP+ Hardware kit
lead_time : 14 days
HP+ Hardware kit
part_number : SPT-2L10-254608-11
preferred_application : etch
lead_time : 6 weeks
ELECTRODE, FLAT T/2 H932
part_number : PS-X1
description_1 :
Our lightest tactical light. Single mode 35 W, 3400 lumens Comes with AC charger, battery and hard plastic case. Color temperature 4300 K.
description_2 :
Lamp type metal halide, 35 W
preferred_application : Police
lead_time : 3 days
Type: Flashlight
Single mode 35W hand-help HID lightpart_number : H3015
description_1 : Wrist assembly flag, A1
lead_time : 14 days
Wrist assembly flag, A1
part_number : VxP_Cover
description_1 : VxP Cover
lead_time : 14 days
VxP Cover
part_number : PRO_ROBOT:PRO_ARM
description_1 : Producer Robot Arm Set
lead_time : 2 weeks
Producer Robot Arm Set
part_number : M92857
description_1 : HP-HP with HP+ wrists
lead_time : 14 days
HP-HP with HP+ wrists
part_number : Centura belt
description_1 : Centura belt
lead_time : 14 days
Centura belt
part_number : XP Hardware
description_1 : XP Hardware (2 complete sets)
lead_time : 14 days
XP Hardware (2 complete sets)
part_number : 4022.471.63636
description_1 : Repair for ASML gap board
lead_time : 3 weeks
Repair for ASML gap board
part_number : XP_BLOCK
description_1 : Clamp, XP blade assembly
description_2 : C3015
lead_time : 14 days
Clamp, XP blade assembly
part_number : HSR 30 ZI
description_1 : Hybrid Führungwagen
lead_time : 2 weeks
Hybrid Führungwagen
part_number : E9020
description_2 :
Bearing, 440C, hybrid, PTFE-PFPE
preferred_application : PVD
lead_time : 2 weeks
Type: Bearings
Bearing, super duplex, for XP robotpart_number : VXP_ANALYSIS
lead_time : 3 weeks
Type: Bearings
Repair Evaluationpart_number : QT500S KIT
description_1 : PRS Sensirion QT500 single dispense, GMPC integrated
lead_time : 3 weeks
PRS Sensirion QT500 single dispense, GMPC integrated
part_number : HG-AC11-P-BH-OEM
description_1 : Heater, double-wall vessel, SS, with 6mm input & output, with 1kW heater & 1 thermocouple, Hi-T snap switch, 200mm long, 90mm OD by 200mm, thermal insulation sleeve, (up to 80 slm 250C @85 psi
lead_time : 3 weeks
Heater, double-wall vessel, SS, with 6mm input & output, with 1kW heater & 1 thermocouple, Hi-T snap switch, 200mm long, 90mm OD by 200mm, thermal insulation sleeve, (up to 80 slm 250C @85 psi
part_number : PS-Andros
description_1 :
Upgrade light kit for Andros Remotec robot. Contains 1 multi-mode HID light, cable, 1 Al battery case, adpater arm, Li-Ion batteries extra
description_2 :
Up to 5 hours of illumination, triggered remotely or at unit
lead_time : 1 week
Type: Bearings
HID light with battery compartment and adapterpart_number : SPT-ES1D10-250233-11
preferred_application : etch
lead_time : 6 weeks
ELECTRODE, UPPER